Resolve DOB pressure and restore legal egress with a certified fire escape installation handled from start to certification.
Our team files the permits, prepares PE-stamped drawings, fabricates the system, and coordinates inspections so you don’t have to navigate legal procedures yourself. As a NYC fire escape contractor serving Manhattan, we keep the project aligned with your building timeline, whether you’re addressing a vacate order or planning during renovation.
Fire escape installation requires a full DOB permit supported by PE-stamped engineering drawings before work begins. The authority reviews documents, schedules staged inspections, and verifies code alignment with the 1968 Building Code and the Multiple Dwelling Law. Landmark properties add LPC review.
We control the process end-to-end, i.e., handle drawings, filings, portal submissions, inspection scheduling, and responses to the authority’s comments. No delays, misfilings, or stop-work risks, just steady installation.
Our legally authorized fire escape installation NYC process involves the following steps:
We measure the façade, confirm attachment points, review DOB records, and determine the correct configuration to comply with second means of egress.
Our licensed PE prepares shop drawings in-house that are authority-stamped and ready for fitting
Our team prepares and submits the full application and tracks it through review for filing confirmation and detailed tracking.
We fabricate the system to the exact planned dimensions using structural steel for fabrication confirmation and materials record.
Our OSHA-trained crew installs platforms, stairs, rails, and ladders per the approved permit and drawings, coordinating required inspections.
We close the project with building authority’s approval and a complete records package, and we provide you with the certification file, PE letter, and compliance documents.
Following are the most common situations that require a new or replacement fire escape:
The inspector determines the structure is unsafe, severely corroded, or beyond repair due to failed joints, cracked members, or load-bearing deterioration.
The property lacks a required fire escape, or a previous owner removed it without DOB approval, leaving an open violation tied to the building.
Renovation scope triggers current NYC Building Code requirements that the existing fmeetse no longer satisfy due to layout, occupancy, or structural changes.
The building cannot remain legally occupied because the proposed condition presents an immediate code-compliance issue.
Not sure which case fits?
Talk to Our Experts for clear advice
Fire escape installation typically requires an Alt-1 or Alt-2 filing, supported by PE drawings, forms, and fee submissions. We prepare the package, submit it, monitor reviews, and respond to objections. Because we produce engineering in-house, you avoid outside delays and extra costs.
Standard approvals take several weeks; expedited options apply in urgent cases. Building without a permit risks stop-work orders, fines, and forced removal. We have managed numerous DOB fire escape permit applications and know how to keep them moving.
We install systems on pre-1968 residential buildings, mixed-use properties, renovation sites, and landmark façades throughout the area. Tight access, older masonry, and oversight demand disciplined permit control.
Our crews work daily in neighborhoods across the borough, ensuring compliant installations, protection of occupants’ safety, and long-term records.
Yes, we design attachment points that distribute load correctly and protect older masonry, then anchor the system without cracking or spalling the façade.
No, we phase the work and control access so occupants remain safe while we install the system from the exterior.
Yes, we routinely work in confined access conditions in Manhattan and set up controlled rigging and staging to complete installation.
We respond directly with updated drawings or documents, resubmit through the portal, and keep the application moving without involving you.
Yes, we align drawings, elevations, and schedule milestones with your project team to avoid conflicts and delays.
Yes, we sequence removal and installation so the building maintains a compliant means of egress throughout the transition.
Yes, we compile drawings, approvals, inspection sign-offs, and photos into a single record set for future audits and resale due diligence.
We manage permits, engineering, fabrication, installation, and certification so you avoid paperwork and delays.
Get a free on-site assessment and a clear plan and cost without commitment.
NYC Fire Escape Painting is a licensed contractor providing fire escape repair, restoration, and violation correction across NYC. We are known for fast response, code-compliant work, and documented inspection support.